This effort began with objective analysis of merit of various claims raised by the contractor (against owner) involved in the Engineering, Procurement, and Construction (EPC) of a new power plant. Over time, some of the claims were resolved or dropped; the rest are the subject of an arbitration period. The assigned representative of Productive Outcomes served as owner-side claims manager through the dispute process.